{"id":2540,"date":"2023-08-25T16:23:16","date_gmt":"2023-08-25T20:23:16","guid":{"rendered":"https:\/\/willistondev.wpengine.com\/?page_id=2540"},"modified":"2025-02-11T16:11:36","modified_gmt":"2025-02-11T21:11:36","slug":"completed-projects","status":"publish","type":"page","link":"https:\/\/www.williston.com\/completed-projects\/","title":{"rendered":"Completed Projects"},"content":{"rendered":"<div class=\"wpb-content-wrapper\">\n[vc_row][vc_column][vc_row_inner][vc_column_inner]<div class=\"ws-spacer ws-spacer--small\"><\/div>[\/vc_column_inner][\/vc_row_inner][\/vc_column][\/vc_row][vc_row][vc_column][vc_row_inner][vc_column_inner]\n        <div class=\"ws-page-header\">\n            <div class=\"ws-page-header__content ws-page-header__content--left\">\n                <div class=\"ws-page-header__inner\">\n            <h1 class=\"ws-page-header__heading ws-page-header__heading--black ws-page-header__heading--medium\">Completed Projects<\/h1>\n                <\/div>\n            <\/div>\n        <\/div><div class=\"ws-spacer ws-spacer--small\"><\/div>\n        <div class=\"ws-excerpt\">\n            <div class=\"ws-excerpt__description\"><p>In keeping with Williston&#8217;s 2014 Strategic Plan\u2014and thanks to generous support from alumni and other donors\u2014the school has made significant improvements in recent years to our campus and facilities. Read about some of our completed projects below.<\/p>\n<\/div>\n        <\/div>[\/vc_column_inner][\/vc_row_inner]<div class=\"ws-spacer ws-spacer--small\"><\/div>[\/vc_column][\/vc_row][vc_row][vc_column][vc_row_inner][vc_column_inner]\n    <div class=\"ws-outer\">\n            <div class=\"ws-inner-image\"><img width=\"640\" height=\"360\" src=\"https:\/\/www.williston.com\/wp-content\/uploads\/2024\/10\/IMG_0373-6-scaled-640x360-1730214732.jpg\" class=\"ws-inner-image__image\" alt=\"\" srcset=\"https:\/\/www.williston.com\/wp-content\/uploads\/2024\/10\/IMG_0373-6-scaled-640x360-1730214732.jpg 640w, https:\/\/www.williston.com\/wp-content\/uploads\/2024\/10\/IMG_0373-6-1110x624.jpg 1110w, https:\/\/www.williston.com\/wp-content\/uploads\/2024\/10\/IMG_0373-6-scaled-1600x900-1730214731.jpg 1600w, https:\/\/www.williston.com\/wp-content\/uploads\/2024\/10\/IMG_0373-6-scaled-1080x608-1730214732.jpg 1080w, https:\/\/www.williston.com\/wp-content\/uploads\/2024\/10\/IMG_0373-6-scaled-320x180-1730214732.jpg 320w\" sizes=\"(max-width: 640px) 100vw, 640px\" \/>\n            <\/div>\n        <div class=\"ws-inner-excerpt\">\n            <div class=\"ws-inner-excerpt__content ws-inner-excerpt__content--not-padded\">\n            <h2 class=\"ws-inner-excerpt__heading ws-inner-excerpt__heading--small\">Plimpton Hall renovation<\/h2>\n        <div class=\"ws-inner-excerpt__description\"\"><p>Plimpton Hall received a major face-lift, as the meeting room in the rear of the building was completely redone, and a new patio area was installed just off it. The new meeting room fills a host of needs for the Williston community and will be a surefire location for major meetings. The room is equipped with two large monitors on sliding walls, which reveal electronic whiteboards behind them, and the requisite connectivity to host virtual meetings. Three rows of tables are set up for the room in normal situations, but all the desks and chairs can be re-arranged depending on meeting needs. Just on the other side of newly installed glass windows is a patio area for congregating. Located conveniently along a well-traveled path for students to get to Easthampton center, the new patio features a patio table surrounded by chairs, and several more Adirondack chairs for additional seating. This area is open to anyone on campus.<\/p>\n<\/div>\n            <\/div>\n        <\/div><\/div>[\/vc_column_inner][\/vc_row_inner]<div class=\"ws-spacer ws-spacer--small\"><\/div>[vc_row_inner][vc_column_inner width=&#8221;1\/3&#8243;][vc_single_image image=&#8221;999763&#8243; img_size=&#8221;thumbnail-square&#8221; css=&#8221;&#8221;]\n        <div class=\"ws-excerpt\">\n            <h2 class=\"ws-excerpt__heading ws-excerpt__heading--small\">Memorial Hall sprinkler system<\/h2>\n            <div class=\"ws-excerpt__description\"><p>One of our oldest dorms on campus, Memorial Hall, received a brand-new fire suppression system in summer 2024. The project, which was entirely custom-fabricated, installed a water-based fire suppression throughout the three living floors and the basement of the building. Every room and hallway in the dormitory now has a sprinkler line running through it. The system had to be connected to the city of Easthampton\u2019s water supply, requiring drilling through the building\u2019s foundation and several feet of earth to connect the lines. From there, the school worked with Warehouse Mechanical Contractors out of Chicopee, Massachusetts to custom-build all of the piping running through the four floors of the dorm.<\/p>\n<\/div>\n        <\/div>[\/vc_column_inner][vc_column_inner width=&#8221;1\/3&#8243;][vc_single_image image=&#8221;999765&#8243; img_size=&#8221;thumbnail-square&#8221; css=&#8221;&#8221;]\n        <div class=\"ws-excerpt\">\n            <h2 class=\"ws-excerpt__heading ws-excerpt__heading--small\">Parents Bridge upgrades<\/h2>\n            <div class=\"ws-excerpt__description\"><p>Parents Bridge has connected our main campus to the athletic center and fields for generations\u2014and now, the bridge will be secured for many years to come. To address erosion issues on both sides of the bridge, the sidewalks were repaired and buffered. This work had to be done in conjunction with the city\u2019s Conservation Commission, due to the ecosystem inside of Williston Pond. The new walkways on both sides of the ramp will now drain rainwater better, and retaining wall blocks were added on the Cain Athletic Center side to help further reinforce the bridge. Additionally, work on the Reed Campus Center side of the bridge also focused on distributing runoff of rainwater that comes from Reed.<\/p>\n<\/div>\n        <\/div>[\/vc_column_inner][vc_column_inner width=&#8221;1\/3&#8243;][vc_single_image image=&#8221;999766&#8243; img_size=&#8221;thumbnail-square&#8221; css=&#8221;&#8221;]\n        <div class=\"ws-excerpt\">\n            <h2 class=\"ws-excerpt__heading ws-excerpt__heading--small\">Wi-Fi Upgrades<\/h2>\n            <div class=\"ws-excerpt__description\"><p>Connectivity in today\u2019s digital age is paramount for students, and the campus got some needed upgrades to ensure everyone can stay connected wherever they go. The school upgraded the models of its access points across campus, allowing the school to connect to a more modern Wi-Fi 6E network. In total, the school has 301 access points set up across the entirety of campus. The school also added new outdoor access points on the Main and Residential quads, creating a more stable connection for devices being used outdoors.<\/p>\n<\/div>\n        <\/div>[\/vc_column_inner][\/vc_row_inner][vc_row_inner][vc_column_inner]<div class=\"ws-spacer ws-spacer--small\"><\/div>[\/vc_column_inner][\/vc_row_inner][vc_row_inner][vc_column_inner width=&#8221;1\/3&#8243;][vc_single_image image=&#8221;972039&#8243; img_size=&#8221;thumbnail-square&#8221;]\n        <div class=\"ws-excerpt\">\n            <h2 class=\"ws-excerpt__heading ws-excerpt__heading--small\">Scott Hall Window Replacement<\/h2>\n            <div class=\"ws-excerpt__description\"><p>Renovations to Scott Hall continued in Summer 2023. After renovating the science classrooms themselves last summer, the windows around the science classrooms were replaced this past summer. The new, energy-efficient windows will help not only with better heating and cooling the rooms throughout the year, but will also limit the amount of outside noise from Payson Avenue that can be heard inside the classroom.<\/p>\n<\/div>\n        <\/div>[\/vc_column_inner][vc_column_inner width=&#8221;1\/3&#8243;][vc_single_image image=&#8221;972045&#8243; img_size=&#8221;thumbnail-square&#8221;]\n        <div class=\"ws-excerpt\">\n            <h2 class=\"ws-excerpt__heading ws-excerpt__heading--small\">New Resource Rooms in Clapp Memorial Library<\/h2>\n            <div class=\"ws-excerpt__description\"><p>After sharing a room on the second floor of the library previously, the Math and Writing resource centers got their own rooms on the first floor of the library during Summer 2023. The new, fully-enclosed rooms will allow students a more private setting to work with teachers. And with the resource centers moving down to the first floor, the second-floor room has been refitted into a classroom for 18 students.<\/p>\n<\/div>\n        <\/div>[\/vc_column_inner][vc_column_inner width=&#8221;1\/3&#8243;][vc_single_image image=&#8221;972035&#8243; img_size=&#8221;thumbnail-square&#8221;]\n        <div class=\"ws-excerpt\">\n            <h2 class=\"ws-excerpt__heading ws-excerpt__heading--small\">Door Replacement and Card Access to Phillips Stevens Chapel<\/h2>\n            <div class=\"ws-excerpt__description\"><p>The front doors to the Phillips Stevens Chapel were replaced in June 2023, and shortly after a keycard reader was installed to help secure the building. The new doors not only provide a superficial upgrade to the building, they are also better equipped to keep out the elements throughout our New England seasons.<\/p>\n<\/div>\n        <\/div>[\/vc_column_inner][\/vc_row_inner]<div class=\"ws-spacer ws-spacer--small\"><\/div>[vc_row_inner][vc_column_inner width=&#8221;1\/3&#8243;][vc_single_image image=&#8221;972254&#8243; img_size=&#8221;thumbnail-square&#8221;]\n        <div class=\"ws-excerpt\">\n            <h2 class=\"ws-excerpt__heading ws-excerpt__heading--small\">Birch Dining Commons Patio Upgrade<\/h2>\n            <div class=\"ws-excerpt__description\"><p>The entranceway to the Birch Dining Commons got a facelift in Summer 2023, as the old patio and stairway that led to Ford Hall were ripped up and recreated. The new patio setup expands the overall footprint of the area, and the new stairs leading up to Ford Hall have heating elements running underneath in order to stop ice and snow from accumulating on the steps.<\/p>\n<\/div>\n        <\/div>[\/vc_column_inner][vc_column_inner width=&#8221;1\/3&#8243;][vc_single_image image=&#8221;972041&#8243; img_size=&#8221;thumbnail-square&#8221;]\n        <div class=\"ws-excerpt\">\n            <h2 class=\"ws-excerpt__heading ws-excerpt__heading--small\">HVAC Upgrades in John Wright House<\/h2>\n            <div class=\"ws-excerpt__description\"><p>When Williston built the new dormitories that make up the Residential Quad, geothermal heating and cooling was installed in all of the dorms\u2014and a hookup was left for John Wright House. In Summer 2023, that hookup was activated, as John Wright got a full HVAC upgrade that will provide heating and\u2014for the first time\u2014air conditioning in every room in the building.<\/p>\n<\/div>\n        <\/div>[\/vc_column_inner][vc_column_inner width=&#8221;1\/3&#8243;][vc_single_image image=&#8221;972042&#8243; img_size=&#8221;thumbnail-square&#8221;]\n        <div class=\"ws-excerpt\">\n            <h2 class=\"ws-excerpt__heading ws-excerpt__heading--small\">Shower Upgrades at Sabina Cain Family Athletic Center<\/h2>\n            <div class=\"ws-excerpt__description\"><p>The shower rooms inside the Sabina Cain Family Athletic Center were completely renovated in Summer 2023, removing the older, communal-style showers in favor of more private, individual stalls. In addition to six individual showers in both the boys&#8217; and girls&#8217; locker rooms, each room also has a handicap-accessible stall.<\/p>\n<\/div>\n        <\/div>[\/vc_column_inner][\/vc_row_inner][vc_row_inner][vc_column_inner width=&#8221;1\/3&#8243;][vc_single_image image=&#8221;945751&#8243; img_size=&#8221;thumbnail-square&#8221;]\n        <div class=\"ws-excerpt\">\n            <h2 class=\"ws-excerpt__heading ws-excerpt__heading--small\">Turf on Sawyer Field<\/h2>\n            <div class=\"ws-excerpt__description\"><p>During the summer of 2021, a new synthetic turf surface was installed at Berube Stadium on Sawyer Field. While the state of the art artificial surface is the primary home for football and girls lacrosse, it is also used for various other sports to include boys\/girls soccer and field hockey.<\/p>\n<\/div>\n        <\/div>[\/vc_column_inner][vc_column_inner width=&#8221;1\/3&#8243;][vc_single_image image=&#8221;912329&#8243; img_size=&#8221;thumbnail-square&#8221;]\n        <div class=\"ws-excerpt\">\n            <h2 class=\"ws-excerpt__heading ws-excerpt__heading--small\">Wold House<\/h2>\n            <div class=\"ws-excerpt__description\"><p>On October 8, 2021, Peter Wold \u201967, a former trustee and longtime supporter of the school, along with his wife Marla, unveiled the new name for the residence hall formerly known as 194 Main Street dorm. Board Chair John Hazen White \u201976 remarked that it was a special day to dedicate \u201cthis great home behind me to the Wold family.\u201d<\/p>\n<\/div><div class=\"ws-excerpt__links\">\n                    <a class=\"ws-excerpt__link ws-excerpt__link--text\" href=\"https:\/\/www.williston.com\/news\/williston-dedicates-two-dorms-new-terrace\/\">Read more here<\/a><\/div>\n        <\/div>[\/vc_column_inner][vc_column_inner width=&#8221;1\/3&#8243;][vc_single_image image=&#8221;912397&#8243; img_size=&#8221;thumbnail-square&#8221;]\n        <div class=\"ws-excerpt\">\n            <h2 class=\"ws-excerpt__heading ws-excerpt__heading--small\">Emily McFadon Vincent House<\/h2>\n            <div class=\"ws-excerpt__description\"><p>EMV, as students refer to Emily McFadon Vincent House, has been home to 40 female students since its opening in the fall of 2020. At its official dedication on October 8, 2021, Head of School Robert W. Hill III spoke of Emily McFadon Vincent (NSFG &#8217;49) as a \u201cquiet and fearless explorer.\u201d<\/p>\n<\/div><div class=\"ws-excerpt__links\">\n                    <a class=\"ws-excerpt__link ws-excerpt__link--text\" href=\"https:\/\/www.williston.com\/news\/williston-dedicates-two-dorms-new-terrace\/\">Read more here<\/a><\/div>\n        <\/div>[\/vc_column_inner][\/vc_row_inner]<div class=\"ws-spacer ws-spacer--large\"><\/div>[vc_row_inner][vc_column_inner width=&#8221;1\/3&#8243;][vc_single_image image=&#8221;430159&#8243; img_size=&#8221;thumbnail-square&#8221;]\n        <div class=\"ws-excerpt\">\n            <h2 class=\"ws-excerpt__heading ws-excerpt__heading--small\">Dugouts at Sawyer Field<\/h2>\n            <div class=\"ws-excerpt__description\"><p>Visitors to Williston baseball games this spring were greeted by the sight of two fresh new dugouts, built with a generous gift from Martha and Walter McLaughlin P\u201912, \u201914. The dugouts provide many benefits to players and fans alike, adding not only coverage from unpredictable New England weather, but also an additional \u201cbaseball feel\u201d to the already hallowed grounds.<\/p>\n<\/div><div class=\"ws-excerpt__links\">\n                    <a class=\"ws-excerpt__link ws-excerpt__link--text\" href=\"https:\/\/www.williston.com\/news\/field-of-dreams\/\" target=\"_blank\">Read more here<\/a><\/div>\n        <\/div>[\/vc_column_inner][vc_column_inner width=&#8221;1\/3&#8243;][vc_single_image image=&#8221;430262&#8243; img_size=&#8221;thumbnail-square&#8221;]\n        <div class=\"ws-excerpt\">\n            <h2 class=\"ws-excerpt__heading ws-excerpt__heading--small\">John Hazen White House<\/h2>\n            <div class=\"ws-excerpt__description\"><p>In October 2018, a newly-constructed, state-of-the-art dormitory on the Williston Northampton School campus was named the John Hazen White House, in honor of Board of Trustees Chair John Hazen White Jr., a member of the class of 1976, and a tireless advocate of the school.<\/p>\n<\/div><div class=\"ws-excerpt__links\">\n                    <a class=\"ws-excerpt__link ws-excerpt__link--text\" href=\"https:\/\/www.williston.com\/news\/building-the-future\/\" target=\"_blank\">Read more here<\/a><\/div>\n        <\/div>[\/vc_column_inner][vc_column_inner width=&#8221;1\/3&#8243;][vc_single_image image=&#8221;912398&#8243; img_size=&#8221;thumbnail-square&#8221;]\n        <div class=\"ws-excerpt\">\n            <h2 class=\"ws-excerpt__heading ws-excerpt__heading--small\">Memorial Hall Terrace<\/h2>\n            <div class=\"ws-excerpt__description\"><p>On October 8, 2021, members of the classes of 1970 and 1971 dedicated the new Memorial Hall Terrace, a gift from the Williston Academy class of 1970.<\/p>\n<\/div><div class=\"ws-excerpt__links\">\n                    <a class=\"ws-excerpt__link ws-excerpt__link--text\" href=\"https:\/\/www.flickr.com\/photos\/willistonnorthampton\/albums\/72157719994992913\">See photos of the dedication<\/a><\/div>\n        <\/div>[\/vc_column_inner][\/vc_row_inner]<div class=\"ws-spacer ws-spacer--large\"><\/div>[vc_row_inner][vc_column_inner width=&#8221;1\/3&#8243;][vc_single_image image=&#8221;430264&#8243; img_size=&#8221;thumbnail-square&#8221;]\n        <div class=\"ws-excerpt\">\n            <h2 class=\"ws-excerpt__heading ws-excerpt__heading--small\">Sabina Cain Family Athletic Center<\/h2>\n            <div class=\"ws-excerpt__description\"><p>To honor the Cain family\u2019s legacy of dedication and philanthropy to Williston, the Board of Trustees enthusiastically endorsed the naming of the athletic center as the Sabina Cain Family Athletic Center. The new name was celebrated and unveiled at a ceremony on June 7, 2019, where visitors could note improvements made to the Center in recent months.<\/p>\n<\/div><div class=\"ws-excerpt__links\">\n                    <a class=\"ws-excerpt__link ws-excerpt__link--text\" href=\"https:\/\/www.williston.com\/news\/williston-announces-major-gift-from-cain-family\/\">Read more here<\/a><\/div>\n        <\/div>[\/vc_column_inner][vc_column_inner width=&#8221;1\/3&#8243;][vc_single_image image=&#8221;218251&#8243; img_size=&#8221;thumbnail-square&#8221;]\n        <div class=\"ws-excerpt\">\n            <h2 class=\"ws-excerpt__heading ws-excerpt__heading--small\">Center for Academic Success<\/h2>\n            <div class=\"ws-excerpt__description\"><p>Williston\u2019s Center for Academic Success is a constellation of support that provides students at every level with the resources, instruction, and academic support they need to succeed. With a dedicated space recently constructed in Clapp Library, the Center for Academic Success helps support and challenge students to reach their full potential. (2018)<\/p>\n<\/div><div class=\"ws-excerpt__links\">\n                    <a class=\"ws-excerpt__link ws-excerpt__link--text\" href=\"\/academics\/center-for-academic-success\/\">Read more<\/a><\/div>\n        <\/div>[\/vc_column_inner][vc_column_inner width=&#8221;1\/3&#8243;][vc_single_image image=&#8221;430176&#8243; img_size=&#8221;thumbnail-square&#8221;]\n        <div class=\"ws-excerpt\">\n            <h2 class=\"ws-excerpt__heading ws-excerpt__heading--small\">Ford Hall Class of 1968 Terrace<\/h2>\n            <div class=\"ws-excerpt__description\"><p>Thanks to generous donations from the class of 1968, a brand-new terrace and gathering area was built in front of Ford Hall. Last year, as part of their 50th reunion, this spirited class raised a record amount to tangibly improve this much-beloved spot, which Ford Hall residents and their fellow students will be appreciating for decades to come. (2018)<\/p>\n<\/div>\n        <\/div>[\/vc_column_inner][\/vc_row_inner]<div class=\"ws-spacer ws-spacer--small\"><\/div>[vc_row_inner][vc_column_inner width=&#8221;1\/3&#8243;][vc_single_image image=&#8221;1358&#8243; img_size=&#8221;thumbnail-square&#8221;]\n        <div class=\"ws-excerpt\">\n            <h2 class=\"ws-excerpt__heading ws-excerpt__heading--small\">New Turf Field<\/h2>\n            <div class=\"ws-excerpt__description\"><p>During the summer of 2018, the synthetic turf field inside the all-weather track was replaced at Galbraith Fields. Put in place by Field Turf, the new state-of-the-art field will be home to field hockey, lacrosse, and other games for 10 to 12 years. (2018)<\/p>\n<\/div>\n        <\/div>[\/vc_column_inner][vc_column_inner width=&#8221;1\/3&#8243;][vc_single_image image=&#8221;37061&#8243; img_size=&#8221;thumbnail-square&#8221;]\n        <div class=\"ws-excerpt\">\n            <h2 class=\"ws-excerpt__heading ws-excerpt__heading--small\">New Cross-country Course<\/h2>\n            <div class=\"ws-excerpt__description\"><p>The newly-completed 3.1-mile course is entirely on Williston-owned property, and takes runners through the lush woods behind campus. (2017)<\/p>\n<\/div>\n        <\/div>[\/vc_column_inner][vc_column_inner width=&#8221;1\/3&#8243;][vc_single_image image=&#8221;37060&#8243; img_size=&#8221;thumbnail-square&#8221;]\n        <div class=\"ws-excerpt\">\n            <h2 class=\"ws-excerpt__heading ws-excerpt__heading--small\">Robert A. Childs '65 Tennis Pavilions<\/h2>\n            <div class=\"ws-excerpt__description\"><p>Two pavilions were constructed near the tennis courts to provide shelter for both players and spectators. Funds for the pavilions were donated by Alice Childs in memory of her son, Robert A. Childs &#8217;65. (2016)<\/p>\n<\/div>\n        <\/div>[\/vc_column_inner][\/vc_row_inner]<div class=\"ws-spacer ws-spacer--small\"><\/div>[vc_row_inner][vc_column_inner width=&#8221;1\/3&#8243;][vc_single_image image=&#8221;37066&#8243; img_size=&#8221;thumbnail-square&#8221;]\n        <div class=\"ws-excerpt\">\n            <h2 class=\"ws-excerpt__heading ws-excerpt__heading--small\">Williston Theatre Improvements<\/h2>\n            <div class=\"ws-excerpt__description\"><p>Thanks to generous donations from parents of seniors, new lighting, sound (including wireless microphones), and projection systems helped upgrade Williston&#8217;s state-of-the-art, 288-seat performance space. (2016)<\/p>\n<\/div>\n        <\/div>[\/vc_column_inner][vc_column_inner width=&#8221;1\/3&#8243;][vc_single_image image=&#8221;37071&#8243; img_size=&#8221;thumbnail-square&#8221;]\n        <div class=\"ws-excerpt\">\n            <h2 class=\"ws-excerpt__heading ws-excerpt__heading--small\">Dining Commons + Stu-Bop Renovations<\/h2>\n            <div class=\"ws-excerpt__description\"><p>The 2015 renovation of Birch Dining Commons included new serving equipment, flooring, and interior design elements. The Stu-Bop student caf\u00e9 was completely overhauled at this time, including the addition of a self-service area for grab-and-go products. (2015)<\/p>\n<\/div>\n        <\/div>[\/vc_column_inner][vc_column_inner width=&#8221;1\/3&#8243;][vc_single_image image=&#8221;37074&#8243; img_size=&#8221;thumbnail-square&#8221;]\n        <div class=\"ws-excerpt\">\n            <h2 class=\"ws-excerpt__heading ws-excerpt__heading--small\">Campus Lighting Enhancements<\/h2>\n            <div class=\"ws-excerpt__description\"><p>Thanks to generous donations from parents of seniors, upgrades and additions were made to exterior lighting on buildings and to lanterns along walkways. The new fixtures feature LED bulbs, which are more energy efficient than traditional incandescent bulbs. (2016)<\/p>\n<\/div>\n        <\/div>[\/vc_column_inner][\/vc_row_inner]<div class=\"ws-spacer ws-spacer--small\"><\/div>[\/vc_column][\/vc_row][vc_row][vc_column][vc_row_inner][vc_column_inner width=&#8221;1\/3&#8243;][vc_single_image image=&#8221;37075&#8243; img_size=&#8221;thumbnail-square&#8221;]\n        <div class=\"ws-excerpt\">\n            <h2 class=\"ws-excerpt__heading ws-excerpt__heading--small\">Dorm Common Room Renovations<\/h2>\n            <div class=\"ws-excerpt__description\"><p>A number of dormitories including Ford Hall, Hathaway House, Sawyer House, and John Wright Dormitory received upgrades to furniture and flooring as part of a campus-wide effort to improve student residences. (2014)<\/p>\n<\/div>\n        <\/div>[\/vc_column_inner][vc_column_inner width=&#8221;1\/3&#8243;][vc_single_image image=&#8221;37077&#8243; img_size=&#8221;thumbnail-square&#8221;]\n        <div class=\"ws-excerpt\">\n            <h2 class=\"ws-excerpt__heading ws-excerpt__heading--small\">New Solar Installations<\/h2>\n            <div class=\"ws-excerpt__description\"><p>Solar panels were installed on the roofs of the Athletic Center and Lossone Rink. The panels produce renewable electricity that offsets the operating costs of both facilities. (2014)<\/p>\n<\/div>\n        <\/div>[\/vc_column_inner][vc_column_inner width=&#8221;1\/3&#8243;][vc_single_image image=&#8221;37081&#8243; img_size=&#8221;thumbnail-square&#8221;]\n        <div class=\"ws-excerpt\">\n            <h2 class=\"ws-excerpt__heading ws-excerpt__heading--small\">Phillips Stevens Chapel Renovations<\/h2>\n            <div class=\"ws-excerpt__description\"><p>The front of the Chapel was renovated to create a more versatile space for performance and other school events. The stage area is now ADA-compliant, and features updated sound and projection systems. (2015)<\/p>\n<\/div>\n        <\/div>[\/vc_column_inner][\/vc_row_inner][\/vc_column][\/vc_row]\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>[vc_row][vc_column][vc_row_inner][vc_column_inner][\/vc_column_inner][\/vc_row_inner][\/vc_column][\/vc_row][vc_row][vc_column][vc_row_inner][vc_column_inner][\/vc_column_inner][\/vc_row_inner][\/vc_column][\/vc_row][vc_row][vc_column][vc_row_inner][vc_column_inner][\/vc_column_inner][\/vc_row_inner][vc_row_inner][vc_column_inner width=&#8221;1\/3&#8243;][vc_single_image image=&#8221;999763&#8243; img_size=&#8221;thumbnail-square&#8221; css=&#8221;&#8221;][\/vc_column_inner][vc_column_inner width=&#8221;1\/3&#8243;][vc_single_image image=&#8221;999765&#8243; img_size=&#8221;thumbnail-square&#8221; css=&#8221;&#8221;][\/vc_column_inner][vc_column_inner width=&#8221;1\/3&#8243;][vc_single_image image=&#8221;999766&#8243; img_size=&#8221;thumbnail-square&#8221; css=&#8221;&#8221;][\/vc_column_inner][\/vc_row_inner][vc_row_inner][vc_column_inner][\/vc_column_inner][\/vc_row_inner][vc_row_inner][vc_column_inner width=&#8221;1\/3&#8243;][vc_single_image image=&#8221;972039&#8243; img_size=&#8221;thumbnail-square&#8221;][\/vc_column_inner][vc_column_inner width=&#8221;1\/3&#8243;][vc_single_image image=&#8221;972045&#8243; img_size=&#8221;thumbnail-square&#8221;][\/vc_column_inner][vc_column_inner width=&#8221;1\/3&#8243;][vc_single_image image=&#8221;972035&#8243; img_size=&#8221;thumbnail-square&#8221;][\/vc_column_inner][\/vc_row_inner][vc_row_inner][vc_column_inner width=&#8221;1\/3&#8243;][vc_single_image image=&#8221;972254&#8243; img_size=&#8221;thumbnail-square&#8221;][\/vc_column_inner][vc_column_inner width=&#8221;1\/3&#8243;][vc_single_image image=&#8221;972041&#8243; img_size=&#8221;thumbnail-square&#8221;][\/vc_column_inner][vc_column_inner width=&#8221;1\/3&#8243;][vc_single_image image=&#8221;972042&#8243;&#8230;<\/p>\n","protected":false},"author":8,"featured_media":0,"parent":0,"menu_order":9999,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"_relevanssi_hide_post":"","_relevanssi_hide_content":"","_relevanssi_pin_for_all":"","_relevanssi_pin_keywords":"","_relevanssi_unpin_keywords":"","_relevanssi_related_keywords":"","_relevanssi_related_include_ids":"","_relevanssi_related_exclude_ids":"","_relevanssi_related_no_append":"","_relevanssi_related_not_related":"","_relevanssi_related_posts":"","_relevanssi_noindex_reason":"","footnotes":""},"wf_page_folders":[71],"class_list":["post-2540","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v26.4 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Completed Projects - Williston<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.williston.com\/completed-projects\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Completed Projects - Williston\" \/>\n<meta property=\"og:description\" content=\"[vc_row][vc_column][vc_row_inner][vc_column_inner][\/vc_column_inner][\/vc_row_inner][\/vc_column][\/vc_row][vc_row][vc_column][vc_row_inner][vc_column_inner][\/vc_column_inner][\/vc_row_inner][\/vc_column][\/vc_row][vc_row][vc_column][vc_row_inner][vc_column_inner][\/vc_column_inner][\/vc_row_inner][vc_row_inner][vc_column_inner width=&#8221;1\/3&#8243;][vc_single_image image=&#8221;999763&#8243; img_size=&#8221;thumbnail-square&#8221; css=&#8221;&#8221;][\/vc_column_inner][vc_column_inner width=&#8221;1\/3&#8243;][vc_single_image image=&#8221;999765&#8243; img_size=&#8221;thumbnail-square&#8221; css=&#8221;&#8221;][\/vc_column_inner][vc_column_inner width=&#8221;1\/3&#8243;][vc_single_image image=&#8221;999766&#8243; img_size=&#8221;thumbnail-square&#8221; css=&#8221;&#8221;][\/vc_column_inner][\/vc_row_inner][vc_row_inner][vc_column_inner][\/vc_column_inner][\/vc_row_inner][vc_row_inner][vc_column_inner width=&#8221;1\/3&#8243;][vc_single_image image=&#8221;972039&#8243; img_size=&#8221;thumbnail-square&#8221;][\/vc_column_inner][vc_column_inner width=&#8221;1\/3&#8243;][vc_single_image image=&#8221;972045&#8243; img_size=&#8221;thumbnail-square&#8221;][\/vc_column_inner][vc_column_inner width=&#8221;1\/3&#8243;][vc_single_image image=&#8221;972035&#8243; img_size=&#8221;thumbnail-square&#8221;][\/vc_column_inner][\/vc_row_inner][vc_row_inner][vc_column_inner width=&#8221;1\/3&#8243;][vc_single_image image=&#8221;972254&#8243; img_size=&#8221;thumbnail-square&#8221;][\/vc_column_inner][vc_column_inner width=&#8221;1\/3&#8243;][vc_single_image image=&#8221;972041&#8243; img_size=&#8221;thumbnail-square&#8221;][\/vc_column_inner][vc_column_inner width=&#8221;1\/3&#8243;][vc_single_image image=&#8221;972042&#8243;...\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.williston.com\/completed-projects\/\" \/>\n<meta property=\"og:site_name\" content=\"Williston\" \/>\n<meta property=\"article:modified_time\" content=\"2025-02-11T21:11:36+00:00\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.williston.com\/completed-projects\/\",\"url\":\"https:\/\/www.williston.com\/completed-projects\/\",\"name\":\"Completed Projects - Williston\",\"isPartOf\":{\"@id\":\"https:\/\/www.williston.com\/#website\"},\"datePublished\":\"2023-08-25T20:23:16+00:00\",\"dateModified\":\"2025-02-11T21:11:36+00:00\",\"breadcrumb\":{\"@id\":\"https:\/\/www.williston.com\/completed-projects\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.williston.com\/completed-projects\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.williston.com\/completed-projects\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.williston.com\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Completed Projects\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.williston.com\/#website\",\"url\":\"https:\/\/www.williston.com\/\",\"name\":\"Williston\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\/\/www.williston.com\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.williston.com\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/www.williston.com\/#organization\",\"name\":\"Williston NorthHampton School\",\"url\":\"https:\/\/www.williston.com\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.williston.com\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/www.williston.com\/wp-content\/uploads\/2018\/09\/williston-shield-square-web.jpg\",\"contentUrl\":\"https:\/\/www.williston.com\/wp-content\/uploads\/2018\/09\/williston-shield-square-web.jpg\",\"width\":1097,\"height\":1097,\"caption\":\"Williston NorthHampton School\"},\"image\":{\"@id\":\"https:\/\/www.williston.com\/#\/schema\/logo\/image\/\"}}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Completed Projects - Williston","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.williston.com\/completed-projects\/","og_locale":"en_US","og_type":"article","og_title":"Completed Projects - Williston","og_description":"[vc_row][vc_column][vc_row_inner][vc_column_inner][\/vc_column_inner][\/vc_row_inner][\/vc_column][\/vc_row][vc_row][vc_column][vc_row_inner][vc_column_inner][\/vc_column_inner][\/vc_row_inner][\/vc_column][\/vc_row][vc_row][vc_column][vc_row_inner][vc_column_inner][\/vc_column_inner][\/vc_row_inner][vc_row_inner][vc_column_inner width=&#8221;1\/3&#8243;][vc_single_image image=&#8221;999763&#8243; img_size=&#8221;thumbnail-square&#8221; css=&#8221;&#8221;][\/vc_column_inner][vc_column_inner width=&#8221;1\/3&#8243;][vc_single_image image=&#8221;999765&#8243; img_size=&#8221;thumbnail-square&#8221; css=&#8221;&#8221;][\/vc_column_inner][vc_column_inner width=&#8221;1\/3&#8243;][vc_single_image image=&#8221;999766&#8243; img_size=&#8221;thumbnail-square&#8221; css=&#8221;&#8221;][\/vc_column_inner][\/vc_row_inner][vc_row_inner][vc_column_inner][\/vc_column_inner][\/vc_row_inner][vc_row_inner][vc_column_inner width=&#8221;1\/3&#8243;][vc_single_image image=&#8221;972039&#8243; img_size=&#8221;thumbnail-square&#8221;][\/vc_column_inner][vc_column_inner width=&#8221;1\/3&#8243;][vc_single_image image=&#8221;972045&#8243; img_size=&#8221;thumbnail-square&#8221;][\/vc_column_inner][vc_column_inner width=&#8221;1\/3&#8243;][vc_single_image image=&#8221;972035&#8243; img_size=&#8221;thumbnail-square&#8221;][\/vc_column_inner][\/vc_row_inner][vc_row_inner][vc_column_inner width=&#8221;1\/3&#8243;][vc_single_image image=&#8221;972254&#8243; img_size=&#8221;thumbnail-square&#8221;][\/vc_column_inner][vc_column_inner width=&#8221;1\/3&#8243;][vc_single_image image=&#8221;972041&#8243; img_size=&#8221;thumbnail-square&#8221;][\/vc_column_inner][vc_column_inner width=&#8221;1\/3&#8243;][vc_single_image image=&#8221;972042&#8243;...","og_url":"https:\/\/www.williston.com\/completed-projects\/","og_site_name":"Williston","article_modified_time":"2025-02-11T21:11:36+00:00","schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.williston.com\/completed-projects\/","url":"https:\/\/www.williston.com\/completed-projects\/","name":"Completed Projects - Williston","isPartOf":{"@id":"https:\/\/www.williston.com\/#website"},"datePublished":"2023-08-25T20:23:16+00:00","dateModified":"2025-02-11T21:11:36+00:00","breadcrumb":{"@id":"https:\/\/www.williston.com\/completed-projects\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.williston.com\/completed-projects\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.williston.com\/completed-projects\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.williston.com\/"},{"@type":"ListItem","position":2,"name":"Completed Projects"}]},{"@type":"WebSite","@id":"https:\/\/www.williston.com\/#website","url":"https:\/\/www.williston.com\/","name":"Williston","description":"","publisher":{"@id":"https:\/\/www.williston.com\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.williston.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.williston.com\/#organization","name":"Williston NorthHampton School","url":"https:\/\/www.williston.com\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.williston.com\/#\/schema\/logo\/image\/","url":"https:\/\/www.williston.com\/wp-content\/uploads\/2018\/09\/williston-shield-square-web.jpg","contentUrl":"https:\/\/www.williston.com\/wp-content\/uploads\/2018\/09\/williston-shield-square-web.jpg","width":1097,"height":1097,"caption":"Williston NorthHampton School"},"image":{"@id":"https:\/\/www.williston.com\/#\/schema\/logo\/image\/"}}]}},"_links":{"self":[{"href":"https:\/\/www.williston.com\/wp-json\/wp\/v2\/pages\/2540","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.williston.com\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.williston.com\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.williston.com\/wp-json\/wp\/v2\/users\/8"}],"replies":[{"embeddable":true,"href":"https:\/\/www.williston.com\/wp-json\/wp\/v2\/comments?post=2540"}],"version-history":[{"count":0,"href":"https:\/\/www.williston.com\/wp-json\/wp\/v2\/pages\/2540\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.williston.com\/wp-json\/wp\/v2\/media?parent=2540"}],"wp:term":[{"taxonomy":"wf_page_folders","embeddable":true,"href":"https:\/\/www.williston.com\/wp-json\/wp\/v2\/wf_page_folders?post=2540"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}